分析伴生气利用率、机组最大负荷率、初始投资、燃料油消耗费用折现、电站维修费用折现、占地及重量对电站方案优选的影响,并利用灰色关联度分析方法定量地确定最优电站方案。为海上平台主电站方案的优选提供新的量化分析方法。
The paper analyzes the influence of gas utilization ratio, unit maximum load rate, initial investment, fuel consumption cost discount, power station maintenance discount, land occupation and weight on power plant project optimization, and uses gray relational analysis method to quantitatively determine the optimal Power station program. It provides a new quantitative analysis method for the optimization of the offshore platform main power station scheme.