论文部分内容阅读
根据《公路工程施工监理规范》和《六武高速公路工程施工监理手册》的规定编制了《六武高速公路路基工程砂性土高填方路堤监理实施细则》并进行了实施。通过实施对高填方路堤施工质量监控,取得了良好的效果,到96区时高填方路堤的沉降速率已经非常缓慢,根据观测资料,路堤沉降已经基本终止。工后沉降将会很小。实施细则的实施达到了质量监控目标,确保工程质量。
According to “Code for Construction Supervision of Highway Engineering” and “Manual of Construction Supervision of Liuwu Expressway”, the “Implementation Rules of Sandy Soil High Filling Embankment Supervision for Subgrade Engineering of Liuwu Expressway” was compiled and implemented. Through the implementation of high embankment embankment construction quality control, and achieved good results, to 96 District high embankment settlement rate has been very slow, according to observations, embankment settlement has basically terminated. Post-construction settlement will be small. Implementation details of the implementation of the quality control objectives, to ensure project quality.