在工程施工阶段,由于受到施工各方人员、材料设备、施工机械、施工工艺贺施工环境之间不断变化且相互制约的影响,工程造价极易出现偏差,此时施工阶段造价控制很重要,以下简要的从建筑工程施工阶段括合同条款,施工组织设计,现场设计变更及签证,施工进度的编制等阶段寻找造价失控的原因,并针对上述几个方面分析控制措施。
During the project construction stage, due to the constant changes and mutual constraints between the construction personnel, materials and equipment, construction machinery and construction technology, the project cost is prone to deviation. At this time, the construction cost control is very important. The following Briefly from the construction phase of the construction contract, including contract terms, construction design, site design changes and visas, construction schedule of the construction phase to find out the reasons for cost control, and for the above aspects analysis of control measures.