The main magnet and main vacuum system of CYCIAE-14 have been installed and commissioned successfully. On this basis, relevant engineering experiences have been summarized, and the improvements have been made to optimize the current
The main magnet and main vacuum system of CYCIAE-14 have been installed and commissioned successfully. On this basis, relevant engineering experiences have been summarized, and the improvements have been made to optimize the current