新河商务区高压线路归并改造工程是焦作市政府2017年重点工程建设之一,主要建设内容将新河商务区7条110 k V高压线路通过沿龙源路建设综合舱,将高压线路改造为入地下电力舱,全长6.10 km,入舱管线包含高压电力、给水、再生水、通讯4种市政管线。综合舱下穿民主南路、群英河、迎宾路、山阳路、瓮涧河等现状道路和河流,总投资7.34亿元,项目总占地面积38.33 hm2。文章结合工程特点,重点分析了该工程建设水土流失特点,并提出了防治水土流失采取的有关措施。对改善城区面貌及投资环境,促进地方区域经济的长远发展具有重大的意义。
The renovation project of high voltage line in Xinhe Business District is one of key construction projects of Jiaozuo City in 2017. The main construction contents include the construction of 7 110 kv high voltage lines in Xinhe Business District through the construction of comprehensive cabins along Longyuan Road to transform the high voltage lines into Into the underground powerhouse, a total length of 6.10 km, into the pipeline contains high voltage power, water, reclaimed water, communications, four kinds of municipal pipelines. A total investment of 734 million yuan will be spent on roads and rivers such as Minnan South Road, Qunying River, Yingbin Road, Sanyang Road and Wengjian River. The project covers a total area of 38.33 hm2. Combined with the characteristics of the project, this paper analyzes the characteristics of soil and water loss in this project and puts forward the relevant measures taken to control soil and water loss. It is of great significance to improving the urban appearance and investment environment and promoting the long-term development of the local regional economy.