最早的抽水蓄能电站于1882年兴建在瑞士的苏黎世,功率515千瓦,扬程153米,汛期将河流多余水量(下库)抽蓄到山上的湖泊(上库),供枯水期放水发电用,是一座季抽蓄型电站。近百年
论文部分内容阅读
最早的抽水蓄能电站于1882年兴建在瑞士的苏黎世,功率515千瓦,扬程153米,汛期将河流多余水量(下库)抽蓄到山上的湖泊(上库),供枯水期放水发电用,是一座季抽蓄型电站。近百年来,特别是1950年以后,国外抽
The earliest pumped storage power station was built in Zurich, Switzerland in 1882, with a power of 515 kilowatts and a head of 153 meters. During the flood season, excess water of the river (lower bank) was pumped to the mountain lake (upper bank) for drainage and power generation in dry season A quarter pumped storage power station. In the past century, especially after 1950, foreign pumping
其他文献
CIS是英文CorporateIdentitySystem的缩写,中文意思是“企业识别系统”,即是通过统。企业的经营理念(MindIdentity)、行为规范(BehaviorIdentity)、视觉传达系统(VisualIdentity),达到
随着人们物质文化生活水平的不断提高,璀璨夺目,色泽迷人的黄金、珠宝饰品已逐步进入千家万户,越来越受到人们的喜爱,成了市场消费的新热点。但是大量假冒伪劣饰品涌入市场,鱼目混
1. A SURVEY OF THE GLOBAL SEISMICITYAccording to the rec()rding of the seismic fletwork o[ China, 20 large earthquakes with M,
1. A SURVEY OF THE GLOBAL SEISMI
第 1期常熟 -太仓M 5 1地震精定位及震源机制解王 ,徐 戈 ,杨彩霞 ,缪发军 (1 )……………………常熟地倾斜固体潮汐调和分析及预报效能范桂英 ,丁建国 ,苏泽云 (4)……
目前国内的闸门设计,一般仍采用初定闸门的结构布置和各构件的断面尺寸,然后对各构件分别进行强度、刚度和稳定性的验算,根据验算结果作适当修正后,一般就作为最终采用的设
(一)流域概况流溪河系珠江水系北江的支流,发源于广东从化县山区,位于北江与东江之间,向西南流入白泥河经广州入海。自河源至河口约长160公里,流域面积约2300平方公里。
(I
广西贺州市深入实施“绿满八桂”造林绿化工程,加快发展珍贵树种,免费赠送珍贵苗木给农民群众在村屯“四旁”和房前屋后种植,进一步推进城乡生态环境建设,绿化美化家园,促进
在印度西部地震灾区视察的印度内政部长阿德瓦尼1月31日说,古吉拉特邦发生的强烈地震给当地造成财产损失可能超过21亿美元。地震造成了巨大的人员伤亡,然而, 《印度快报》31
20 0 1年的地学夏令营活动是在国土资源部、中国地质学会的领导下 ,由四川省国土资源厅和四川省地质学会联合举办的。今年的四川营由成都营和攀枝花营组成 ,是自 1981年以来
重力坝断面的设计应在保证安全、经济的前提下,满足枢纽布置、运行和施工等各方面要求,故是一个复杂的工作。通常按下列步骤进行。1.简化一些条件,仅考虑作用在坝体上的主要