论文部分内容阅读
1993年随着金川二期主体工程闪速炉系统的陆续投运生产,其辅助系统也同时施工并积极在进行交工验收,作为闪速炉烟气利用、综合环保的三硫酸工程即为其一。这项工程的电气方面,其关键性设备是从德国引进的3650kW三相异步电动机,此大型设备一则没有相关资料借鉴,二则又无实际起动、运行以及起动是否会对系统有大的扰动和影
1993 with the main phase of Jinchuan flash furnace system put into operation one after another, the auxiliary system is also at the same time the construction and delivery of inspection and acceptance, as a flash furnace flue gas utilization, comprehensive environmental protection is one of the three sulfuric acid project . The electrical aspects of the project, the key equipment is the introduction of 3650kW three-phase asynchronous motor from Germany, this large-scale equipment, there is no relevant information for reference, the two without actual start-up, operation and start whether the system will have a big disturbance And shadow