一、前言随着水电建设事业的不断发展,各种类型大、中、小型的水轮发电机组,特别是高水头和低水头大流量机组必将更多的出现。由于设计,计算,制造,按装,运行等方面都存在这种或那种问题,以及人们对噪声与振动危害的重视,因而对噪声与振动及之相关的动态过程的要求亦愈来愈高。为了希望能在机组设计时,就能对可能引起噪声、振动的有关因素进行仔细研究,并加以控制和预防,在这种情况下,我们对全国13个省、市大中小型水力发电站
I. Introduction With the continuous development of hydropower construction, various types of large, medium and small hydro-generating units, especially high-head and low-head high-flow units will surely appear more. Due to the existence of one kind or another of the problems in design, calculation, manufacture, loading, operation and so on, as well as people’s attention to the noise and vibration hazards, the requirements on the dynamic processes related to noise and vibration are also getting higher and higher . In order to hope that when the unit design, can cause noise, vibration of the relevant factors to be carefully studied and to be controlled and prevented, in this case, we are 13 provinces, municipalities large and medium-sized hydroelectric power station