高濑坝和七仓坝是建设在信浓河水系高濑河上游的堆石坝,这二个水库分别成为扬水式的新高濑河发电站(最大输出功率为1280000千瓦)的上池和下池,而七仓库则成为中之泽发电站的调节池。这两个水库都是1971年11月动工的。七仓水库从1978年11月开始蓄水,高濑水库从1978年12月开始蓄水,预定从1979年6月一部分机组开始发电。蓄水期间以及运转后的大坝管理,是根据对大坝检查巡视等方面来掌握水库的动态,以
Takase Dam and Seiku Dam are rockfill dam constructed on the upper Takase River in the Shinano River system, and these two reservoirs are the upper pond and the lower pond of the Yangsan-type new Takase River power station (with a maximum output of 1,280,000 kilowatts) , While the seven warehouses became the regulator pool in Zazhi Power Station. Both reservoirs started in November 1971. Qicang Reservoir began its water storage in November 1978, and the Gaoze Reservoir started its water storage in December 1978 and is scheduled to start generating electricity from some of the units in June 1979. During the storage period and after the operation of the dam management, is based on the dam inspection tour to master the dynamics of the reservoir to