连续箱梁桥在转体前后结构受力复杂,施工监控目的就是要确保桥体安全及转体过程的平稳性、转体单元成桥后线形及受力状态符合设计要求,通过监控及时地将信息进行分析并反馈到施工现场,有利于有效组织施工。结合哈大铁路客运专线刘房子特大桥主孔(48+80+48)m连续箱梁转体25°上跨既有京哈铁路施工实例,总结了在确保既有线铁路安全营运畅通的前提下对重4 700 kN的转体结构施工监控技术。对监控的主要内容、施工监测手段与过程等方面进行了分析,提出有效的施工控制措施和建议。
Continuous box girder bridge in the swivel body structure before and after the complex, the purpose of construction monitoring is to ensure the safety of the bridge and the stability of the swivel process, swivel unit after the bridge line shape and stress state meets the design requirements, through the timely monitoring Information analysis and feedback to the construction site, is conducive to the effective organization of construction. Combining with the main hole (48 + 80 + 48) m of the Liufangzi Extra-large Bridge on Harbin-Dalian Railway Passenger Dedicated Line and the example of construction of Jing-hau Railway over 25 ° of continuous box girder, this paper summarizes the construction of Beijing-Harbin Railway on the premise of ensuring the smooth operation of existing railway lines Construction Monitoring Technology for Swivel Structure with 4 700 kN Counterweight. The main contents of the monitoring, construction monitoring methods and processes were analyzed, and put forward effective construction control measures and recommendations.