由于平台导线断裂事故,导致禁用冷剥脱头工艺。但由于装配结构、安全及劳动保护的原因,必需采取冷剥脱头工艺。经精选剥线钳并进行工艺研究试验,证明在“质量保证措施”的保证下,冷剥脱头工艺可达到1979年《美国波音公司电子工艺标准手册》所定标准,并根据装配多发产品,发发成功的实践经验。已在长征三号装配过程中使用冷剥脱头工艺。
Due to a broken conductor on the platform, the cold stripping process is disabled. However, due to assembly structure, safety and labor protection reasons, it is necessary to adopt a cold stripping process. The selection of wire stripper and the process of research and testing to prove that the “quality assurance measures” under the guarantee, cold stripping process can reach the 1979 “American Boeing Electronic Technology Standards Handbook” set the standard, and according to the assembly of multiple products, hair Send successful practical experience. The cold stripping process has been used during the installation of the LM-3.