论文部分内容阅读
本文通过某多金属矿初步设计总结,说明了改扩建企业的总体布置设计,必须深入调查研究企业已占有土地的综合利用,并据此调整和优化设计方案。如该工程设计综合利用原有废石场,统筹布置尾矿库、废石场、污水处理和生产取水工程,从而节约了用地、节省了投资、减少了环境污染。
Based on the preliminary design summary of a polymetallic deposit, this paper illustrates the overall layout design of the expansion and expansion enterprises. It is necessary to thoroughly investigate and study the comprehensive utilization of the land already occupied by the enterprises and adjust and optimize the design scheme accordingly. If the project design and comprehensive utilization of the original waste rock, co-ordination of tailings depot, waste rock, sewage treatment and production of water projects, thereby saving land, saving investment and reduce environmental pollution.