鞍钢烧结总厂二烧车间,是由苏联帮助建设,1956年正式投产的烧结矿生产车间。由于工艺落后,需要改造。仅熔剂破碎一项的能耗,就直接影响了成本的降低。二烧目前有二台锤式破碎机,日破碎量为1920t(石灰石块、白云石块破碎粒度为<3mm),年破碎量为700800t。由于锤式破碎机磨损大,维修周期短,备件使用寿命低,耗电量大,成本高,并且大量<3mm熔剂重新回到锤式破碎机中,造成
Anshan Iron and Steel Sintering Plant two burning workshop, is the Soviet Union to help construction, formally put into operation in 1956 sinter production workshop. As technology behind, you need to transform. Only a broken flux of energy consumption, will directly affect the cost reduction. Two burned currently has two sets of hammer crusher, daily crushing capacity of 1920t (limestone, dolomite crushing particle size <3mm), the annual crushing capacity of 700800t. As the hammer crusher wear and tear, short maintenance cycle, spare parts life is low, power consumption, high cost, and a large number of <3mm flux back to the hammer crusher, resulting