在保证提高建筑舒适性的条件下,合理使用能源,不断提高能源利用效率。以批准的工程建设项目可研报告和投资估算为限额,部署实施工程方案设计和初步设计,并以批准的工程初步设计及概算造价为限额,部署控制施工图设计;同时各阶段、各专业设计工种在保证工程建设项目使用功能定位和安全的前提下,按分配的投资限额严格控制设计,并利用价值工程原理优化设计方案,促进运用新工艺、新设备、新材料等措施,控制和降低工程投资额,提高投资效益。
Under the condition of ensuring the improvement of building comfort, energy is used rationally and energy efficiency is continuously improved. Based on the feasibility study report and investment estimate of the approved project construction project, the project design and preliminary design will be deployed and implemented, and the approved preliminary design and estimated cost will be used as the limit to deploy the control plan design; at the same time, each stage and each professional design Under the premise of ensuring the functional positioning and safety of engineering construction projects, the types of work are strictly controlled according to the allocated investment quotas, and the value engineering principles are used to optimize the design scheme, and new measures, new equipment, and new materials are used to control and reduce projects. Investment amount, improve investment efficiency.