本文通过对三峡工程蓄水条件和前、后期水电机组运行特点的研究,重点分析比较了水轮机初期转轮和永久转轮的技术经济性以及对三峡电站初期发电方式提出了看法。
Based on the research on the storage conditions of the Three Gorges Project and the operation characteristics of the former and later hydropower units, this paper mainly analyzes and compares the technical economy of the initial runner and the permanent runner of the turbine and puts forward the opinions on the initial power generation mode of the Three Gorges Power Station.