论文部分内容阅读
2010年根据矿里安排,设计主井2#煤仓皮带运输机。要求:每小时需要运煤600吨,往上拉长度55米,倾斜角度14°50′,大气潮湿,皮带速度1.6米/秒,传动滚筒数目2个,围包角α=460°;选择皮带,电动机,减速器。
According to the mine arrangement in 2010, design the main shaft 2 # bunker belt conveyor. Requirements: 600 tons of coal per hour needs to be pulled up 55 meters long, the angle of inclination of 14 ° 50 ’, atmospheric humidity, the belt speed of 1.6 m / s, the number of transmission drum 2, wrap angle α = 460 °; , Motor, reducer.