东林煤矿由于-200 m新水平延伸,-100 m水平以上采区开采相继结束,形成了许多废弃巷道,开采深度的增加导致通风区域多而散,致使通风系统复杂,管理难度大,通风运营成本高。为了满足连续安全生产需要和节省通风费用,从简化通风系统、减少无效风量和降低通风阻力入手,采用封闭采后区域和无效巷道、缩短通风距离、减小巷道断面周长、增大巷道断面面积、增加回风巷道条数和避免巷道内风量过大,并结合改进矿井主要通风机,对东林煤矿通风系统进行了优化。从而满足了安全生产需要,降低了矿井通风成本,改善了工作环境。
Due to the new level extension of -200 m in Donglin Mine, the mining of the mining area above -100 m level has been completed one after another, forming many abandoned roadways. The increase of mining depth leads to more and more scattered ventilation areas, resulting in complicated ventilation system, difficult management and ventilation operation high cost. In order to meet the need of continuous safety production and save the ventilation cost, starting with simplifying the ventilation system, reducing the ineffective air volume and reducing the ventilation resistance, adopting closed post-harvesting area and ineffective laneway, shortening the ventilation distance, reducing the perimeter of laneway section and increasing the cross-section area , Increase the number of return airways and avoid excessive air flow in the roadway, and optimize the ventilation system of Donglin Coal Mine in combination with improving the main ventilator of the mine. Thus meeting the need of safety production, reducing the mine ventilation cost and improving the working environment.