论文部分内容阅读
受水利部委托,水利部水利水电规划设计总院于2003年8月25日至29日在北京组织召开了丹江口水利枢纽大坝加高工程可行性研究报告审查会,对长江水利委员会长江勘测规划设计研究院上报的《丹江口水利枢纽大坝加高工程可行性研究报告》进行了审查。会议特邀专家:中国工程院院士朱伯芳、中国工程院院士曹楚生、中国水利水电科学研究院结构材料研究所所长张国新。会议由国务院南水北调工程建设委员会办公室总工汪易森主持。
Entrusted by the Ministry of Water Resources, the Planning and Design Institute of Water Conservancy and Hydropower of the Ministry of Water Resources organized a review meeting on the feasibility study of the dam heightening project of the Danjiangkou Hydropower Project from August 25 to 29, 2003 in Beijing. The Yangtze River Water Resources Commission Yangtze River Survey and Planning The Design and Research Institute reported “Danjiangkou Hydropower Station Feasibility Study Report” was reviewed. Meeting invited experts: Chinese Academy of Engineering Zhu Bofang, Chinese Academy of Engineering Cao Chusheng, China Institute of Water Resources and Hydropower Research Institute of structural materials Zhang Guoxin. The meeting was chaired by Wang Yi-sen, chief engineer of the office of the State Council’s South-North Water Diversion Project Construction Committee.