论文部分内容阅读
1 隧道概况及机械设备1 1 隧道概况 :施工隧道为单线铁路隧道 ,全长 4 76 7m ,分两头掘进 ,出口 2 344m ,进口 2 4 33m ,出口为主试验现场。离洞门大约 1km处凿一斜洞 30 0m左右 ,试验时正洞掘进 195 0m ,采用全断面深眼爆破机械化出碴无轨运输作业。采用单机压入式送
1 Tunnel Overview and Mechanical Equipment 1 1 Tunnel Overview: The construction tunnel is a single-track railway tunnel with a total length of 4 767m and two tunnels with an exit of 2 344m and an inlet of 2 4 33m. The exit is the main test site. About 1km away from the door, a inclined hole of 30m was drilled. During the test, 195m of tunnels were being drilled, and full-face deep-hole blasting was used to mechanize the ballastless track transportation. Using a single push-type send