Considering the fact that the temperature distribution in furnace of a tangential fired pulverized coal boiler is difficult to be measured and monitored, two-st
The start-up of external circulation-added internal circulation(IC) reactor was finished in 26 d, 32 d fewer than that of IC reactor. To evaluate the influence