论文部分内容阅读
新疆某综合利用枢纽一期工程水土保持监测和生态保护工作深受建设管理单位的重视,能够完全按照水保方案报告书实施各种预防保护措施,总体布局合理,防治效果明显,水土流失量在可控范围内,达到了水土保持方案提出的防治目标。
The monitoring and ecological protection of soil and water conservation in the first phase project of a comprehensive utilization hub in Xinjiang is highly valued by the construction management unit. Various preventive and protective measures can be implemented in full accordance with the report of the water conservancy program. The overall layout is reasonable and the control effect is obvious. The amount of soil and water loss Controllable within the reach of the soil and water conservation program proposed prevention and control goals.