二滩水电站将是我国在2000年以前建成的装机容量最大的水电站,其单机容量550MW,总装机容量3300万MW。水轮发电机组将通过国际招标采购,引进技术,合作生产。为吸取世界上特大型水电站大型水轮发电机组有关招标、参数选择、设备制造和运行方面的经验,博采众长,使设计、招标采购、建设管理更趋完善,财政部、能源部决定由二滩水电开发公司组团,赴巴西、委内瑞拉进行技术考察。考察团一行8人,于1992年1月9日离京赴巴西,2月2日回到北京。考察活动大体上分三个阶段进行。第一阶段,在巴西由巴西中央电力公司负责接待,考察了在巴西的伏依特工厂(VOITH)、西门子工厂(SIEMENS)、伯诺大重机厂(GEC ALSTHOMMECANICA PESADA S.A)、委拉瑞斯重机厂
Ertan Hydropower Station will be built in China by 2000, the largest installed capacity of hydropower station, its single capacity of 550MW, with a total installed capacity of 33 million MW. Hydrogenerator units will be purchased through international bidding, the introduction of technology, co-production. In order to draw on the experiences of tendering, parameter selection, equipment manufacturing and operation of large-scale hydroelectric generating units in the world’s large hydropower stations, Bocaizhongzhang was selected to make design, bidding and procurement and construction management more perfect. The Ministry of Finance and the Ministry of Energy decided that Ertan Hydropower Development company delegation, went to Brazil, Venezuela for technical inspection. The delegation of eight people, left for Beijing on January 9, 1992 and returned to Beijing on February 2. The inspection activities are generally divided into three stages. The first phase was hosted by Brazilian Central Power Company in Brazil and examined the VOITH, SIEMENS, GEC ALSTHOMMECANICA PESADA SA, Heavy machine factory