论文部分内容阅读
南疆铁路全程走向是由兰新铁路吐鲁番站起,经库尔勒、阿克苏至喀什。第一期工程由吐鲁番修至库尔勒(简称吐库段),1974年4月正式开工,1979年11月铺轨到库尔勒西站,正线长476.54公里,桥梁462座,遂道30座,总投资11.25亿元,平均每公里造价236万元。
The whole journey of South Xinjiang Railway is from the Turpan Railway Station, by Korla, Aksu to Kashgar. The first phase of the project from Turpan to Korla (referred to as Tuku paragraph), in April 1974 formally started in November 1979 deposed to Korla West Station, the main line is 476.54 km long, 462 bridges, tunnel 30, the total investment 1125000000 yuan, the average cost of 2360000 yuan per kilometer.