某工程 ,33层 ,基础施工时 ,为防止塌方 ,施工组织设计采用现浇混凝土支撑纵梁 ,即图1中的支撑纵梁。第一道支撑纵梁标高为 -0.600m ,待混凝土浇筑完毕 ,挖土至标高 -5.300m处时 ,采用挖土机挖土 ,其抓斗间断触碰第一道支撑纵梁。9月15日夜 ,12名钢筋工在基坑内绑扎钢筋 ,突然 ,“啪啪”几声响 ,第一道支撑纵梁下的垫层混凝土成片成块掉入基坑 ,砸在钢筋工身上 ,重伤5人 ,死亡7人
A project, 33-story, foundation construction, in order to prevent landslides, the construction organization design using cast-in-place concrete support stringer, the support stringer in Figure 1. The first support longitudinal beam elevation of -0.600m, to be concrete pouring completed, excavation to the elevation of -5.300m Department, using excavators excavation, the grab intermittently touch the first support stringer. On the night of September 15, 12 rebar workers tied rebars inside the foundation pit. Suddenly, the sound of “popping” suddenly broke into the foundation pit under the slab concrete under the first supporting stringer, smashed on the rebar worker, 5 seriously injured, 7 people were killed