论文部分内容阅读
工程设计中,经常会遇到由于各种各样的原因而停工较久但未完工或已完工若干层,后因功能变更修改平面,导致竖向构件及结构荷载改变的工程。这些工程的设计不同于新建工程的设计,与既有工程的改造和加固设计也有区别.本文以某工程为例介绍了该工程的改造与续建设计,涉及到已建结构校对复核,钢筋锚固,施工注意事项等,得出一些结论。
In engineering design, it is often encountered that due to a variety of reasons, the work stoppage is relatively long but has not been completed or several layers have been completed, and the plane is changed due to the change of function, resulting in the change of the vertical members and structural loads. The design of these projects is different from the design of the new project. There are also differences between the existing project and the reinforcement design. This article takes an engineering project as an example to introduce the project’s renovation and re-construction design, involving the review of the constructed structure, reinforcement anchorage , construction considerations, etc., to draw some conclusions.