论文部分内容阅读
随着我国社会经济的快速发展,科学技术的不断进步,城市化进程的不断加快,人们对于生活质量有了越来越高的要求,对于道路工程建设质量也有了更高的要求。可是就我国目前情况来看,在实际工程建设过程中,现浇预应力混凝土的连续梁施工过程中还存在很多问题,最为明显的就是对其结构尺寸的把握,这种现象在很大程度上阻碍了施工技术的快速提升与发展。这就要求相关施工人员比较对这一问题引起足够的重视,对其施工质量要点做好把控。本文主要对现浇预应力混凝土连续梁施工技术进行了一定的分析与研究。
With the rapid socio-economic development of our country, the continuous improvement of science and technology and the accelerating urbanization process, people have higher and higher requirements on the quality of life and have higher requirements on the quality of road construction. However, judging from the current situation in our country, many problems still exist in the construction process of continuous beams of prestressed concrete in the process of actual construction. The most obvious is the grasping of its structural dimensions. To a large extent, this phenomenon Hinder the rapid promotion and development of construction technology. This requires that the relevant construction workers should pay more attention to this issue and control the quality of their construction. This paper mainly analyzes the construction technology of cast-in-place prestressed concrete continuous beams.