一架EMD阶段的V-22进入组装阶段

来源 :国际航空 | 被引量 : 0次 | 上传用户:liongliong456
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
去年12月初,波音直升机分部完成了首架具有生产型特征的V-22机身的组装工作,并把其运至阿林顿完成与贝尔组装的V-22机翼的对接工作。在V-22计划中因综合产品组(IPT)采用了大量先进制造技术和新工艺方法,使工程与制造发展阶段(EMD)最初3年中生产的V-22的离厂成本降低了23%。迄今,已使该计划全寿命期总计划采购费节省了50亿美 In early December last year, the Boeing Helicopter Division completed the assembly of the first production-type V-22 fuselage and shipped it to Arlington for docking with the Bell-mounted V-22 wing. The introduction of a large number of advanced manufacturing and new process technologies for the Integrated Product Group (IPT) in the V-22 program resulted in a 23% reduction in the cost of leaving the factory for the V-22 produced during the first three years of the Engineering and Manufacturing Development Phase (EMD) . So far, a total of 5 billion U.S. dollars has been saved in the total planned lifetime procurement life of the program
其他文献
自《中国兽药典》九○年版二部(以下简称《兽药典》)颁布实施以来,笔者在执行过程中,发现其收载的部分品种植物学名与《中国植物志》(以下简称《植物志》)中的记载不同,其大
北京市人民代表大会常务委员会公告第13号《北京市城市绿化条例》已由北京市第九届人民代表大会常务委员会第十九次会议于1990年4月21日通过,现予公布,自1990年7月1日起施行
GE公司计划推迟GE90发动机的增推型的研制进度,这种发动机的推力为454千牛,是为波音777-200X/-300X研制的,无限期延迟该发动机的取证直到波音公司找到这种飞机的固定的启动用
美国GE公司在位于埃文戴尔的设备上正在进行低可探测性的轴对称发动机喷管的地面耐久性试验。该公司计划在F110-GE-129发动机/低可探测性喷管上累计进行500多小时加速任务试
【正】 改革开放以来,我国各地的经济活动日益活跃,各种经济纠纷案件也相应增多。而有些法院的同志错误地认为,如果保护外地当事人的合法权益,会影响本地经济发展,因而常常偏
1995年11月28-30日欧空局在欧洲空间技术研究中心(ESTEC)举办了首届欧空局系统工程会议,共有170多位代表出席了会议并发表了30余篇论文和报告,主要探讨航天领域中的系统工程
主任、各位副主任、各位委员:我受市人民政府委托,向本次会议作《北京市城市绿化管理条例(草案)》的说明。一、制定本条例的必要性1982年3月20日第七届市人民代表大会第六次
为适应党中央提出的两个根本性转变,贯彻总公司《改革与发展纲要》,统一认识,转变观念,明确目标,深化改革,进一步开创航天计量工作新局面,总公司于1997年1月8日至10日在廊坊
1997年1月22~24日我会在苏州长风机械厂召开了五届四次理事会(扩大)会议。省、市航空航天学会理事,各工作委员会正、副主任,各专业委员会正、副主任、联络秘书,学术秘书计150
为了加强飞机制造商、航空器材供应商、航空公司、科研单位以及民航主管部门之间在民用客机的维护与维修方面的交流,空中客车公司和民航总局于10月14~17日在中国民航干部管理