现在的项目多数采用工程量清单来进行招投标,按照GB50500-2013《建设工程工程量清单计价规范》9.4项目特征描述不符的中的:“9.4.1承包人在招标工程量清单中对项目特征的描述,应被认为是准确的和全面的,并且与实际施工要求相符合。承包人应按照发包人提供的工程量清单,根据其项目特征描述的内容及有关要求实施合同工程,直到其被改变为止;9.4.2合同履行期间,出现实际施工设计图纸(含设计变
The current project most of the use of the bill of quantities for bidding, according to GB50500-2013 ”construction project bill of quantities valuation specification“ 9.4 project characteristics described in the inconsistent: ”9.4.1 contractor in the tender list of quantities of the project The description of the characteristics shall be considered as accurate and comprehensive and shall be in conformity with the actual construction requirements.The contractor shall carry out the contract works according to the bill of quantities provided by the Employer and according to the description of the characteristics of the Project and the relevant requirements until it Was changed until 9.4.2 contract performance period, the actual construction design drawings (including design changes