新华联·运河湾北区园林景观工程位于北京市通州区。项目施工总面积约43000m2,其中绿地面积约29000m2,共种植乔木1623株、灌木约4100株、地被色带面积4700m2、花卉面积约1751m2、草坪面积15182m2;园路广场景观面积约14000m2。项目由北京林大林业科技股份有限公司施工,于2011年10月25日开工,2012年4月5日竣工。土方地形此项目运用大量土方堆筑地形是一大亮点。通过堆筑地形将园区场地进行合理分割,增大了尺度感。在地形堆筑时合理考虑与建筑的关系,不仅保证了一层业主生活的私密性和室内
New Hualian Canal Bay North Landscape Engineering is located in Tongzhou District of Beijing. The total construction area of the project is about 43000m2, of which green area is about 29000m2. There are altogether 1623 trees planted, 4,100 trees planted, 4,007 shrubs covered by ribbons, 4700m2 ribbons covered with flowers, 1751m2 flowers and 15182m2 grassy areas. The project was constructed by Beijing Forestry Science and Technology Co., Ltd. and started construction on October 25, 2011 and completed on April 5, 2012. Earthwork topography This project uses a lot of earthwork to build the terrain is a major bright spot. By stacking the terrain will be a reasonable division of the park site, an increase of sense of scale. Considering the relationship with the building when building the terrain, it not only ensures the privacy of the owner and the indoor