论文部分内容阅读
1980年,华中工学院与武汉汽轮发电机厂联合承担了湖北省科委下达的 GD-W-120全贯流式水轮发电机组的研制任务。其参数为:设计水头3米,最大水头5米,最小水头0.5米,设计流量6.2米~3/秒,单机功率120千瓦。经过6年的艰苦研制,终于制成真机,并已于1987年3月安装在湖北省浠水县白莲河水库西干渠上。通过试运行,完全符合设计与技术规范的要求。
In 1980, Huazhong Polytechnic Institute and Wuhan Steam Turbine Generator Factory jointly assumed the task of developing the GD-W-120 full-flow hydro-generating set issued by Hubei Science and Technology Commission. The parameters are: Design head 3 meters, the maximum head 5 meters, the minimum head 0.5 meters, the design flow of 6.2 m ~ 3 / s, stand-alone power of 120 kilowatts. After six years of painstaking research and development, finally made a real machine, and was installed in March 1987 in Xishui County, Hubei Province, Bailianhe Reservoir West trunk canal. Through the trial operation, in full compliance with the design and technical specifications.