论文部分内容阅读
基于案例的CCS投资项目成本估算方法研究
【出 处】
:
煤炭经济研究
【发表日期】
:
2019年11期
其他文献
,Impact Parameter Dependence of the Double Neutron/Proton Ratio of Nucleon Emissions in Isotopic Rea
Within the transport model IBUU04, we investigate the double neutron/proton ratio of free nucleons taken from two reaction systems using two Sn isotopes at a be
期刊
描述了一种根据丝杠螺距误差的动态特征而设计的智能控制方法,基于对丝杠磨削过程中传动链误差的各种瞬变特征的分析,建立了智能控制规则,并应用于实际丝杠磨削过程的控制中,
We prepare Nd doped anodic aluminium oxide (Nd:AAO) template by using Nd doped aluminium foils through two-step anodization processes. Photoluminescence (PL) fr
期刊
In our previous work [Phys. Lett. (to be published), Chin. Phys. Lett. 23 (2006) 3226], we introduced a separable pairing force for relativistic Hartree-Bogoliu
期刊