论文部分内容阅读
由山西省地球物理化学勘查院承担的河津市义唐铁铜矿普查项目深部找矿取得阶段性进展,已竣工的3个钻孔均见矿体,最大单层见矿厚度达34.16m。该项目已完成的3个钻孔,在739~1 859m深度范围内发现多层磁
The deep prospecting of the Yi Tang iron-copper mine in Hejin City, undertaken by the Geophysical and Geochemical Exploration Bureau of Shanxi Province, made preliminary progress. Three completed boreholes were all found in the ore body, with the maximum thickness of 34.16m. The project has completed three drill holes, found in the depth range of 739 ~ 1 859m multilayer magnetic