论文部分内容阅读
文章通过对两座悬臂施工的桥梁,测试并分析在施工过程中温度变化对梁体的影响,进而介绍对温度引起的变化加以修正的方法。
Through the bridge construction of two cantilever beams, the article tests and analyzes the influence of temperature changes on the beam body during construction, and then introduces the method of correcting temperature-induced changes.