黄河口崔家河湾,由于无工程控制,处于自由演变状态,滩岸坍塌严重,湾顶逐年下移,导致苇改闸控导工程脱溜,坝前淤滩宽200~1200m,以下河势出现较大变化,西河口扬水船(站)引水十分困难,给工农业生产带来了较大损失。如任其发展,将影响苇改闸以下河口流路的稳定,甚或十几年河口治理的成果尽弃。针对这种局面,当务之急是修建崔家控导工程,完善和配套其它已建工程,控制河势朝好的方向转化。
The Yellow River estuary Cuijiahe Bay, due to no engineering control, is in a state of free evolution, severe beach bank collapse, and the downward displacement of the top of the bay every year. As a result, Great changes, Xihekou pumping station (station) water diversion is very difficult, to the industrial and agricultural production has brought greater losses. If allowed to develop, it will affect the stability of the flow path of the estuary below the reed gates, or even abandon the achievements of estuarine governance over a dozen years. In response to this situation, it is imperative to build Cui Jia control project, improve and support other projects have been completed to control the direction of the river into a good direction.