论文部分内容阅读
设计变更是水利水电工程造价的重要组成部分如何在工程实施过程中处理好设计变更对于工程投资控制有着重要的意义。本文结合工程实例提出了合理确定设计变更的原则与举措。
Design change is an important part of water conservancy and hydropower project cost How to deal with design changes in the process of project implementation is of great significance for project investment control. This paper puts forward the principle and measures to reasonably determine the design change with engineering examples.