一、更新改造资金的使用和管理现状 随着生产的发展和资金供应方式的变化,用于国营工交企业的更新改造资金增长很快。“一五”时期为23亿元,“二五”时期为100亿元“1963—1965年为74亿元,“三五”时期是215元,“四五”时期473亿元,“五五”时期达到870亿元,“六五”计划为1,300亿元。资金的供应是在逐期增加,但是由于各部门集中过多,更改资金分散布置,没有发挥到应该发挥的作用,使经济效益不高。据调查,百万元的挖、革、改项目的固定资产交付使用率只有62.4%,比基本建设投资的交付使用率还低16.7%。
First, the status quo of the use and management of renewal and transformation funds With the development of production and the change in the mode of capital supply, the funds used for the renovation and transformation of state-owned enterprises are growing rapidly. The “1st 5” period was 2.3 billion yuan, the “2 5” period was 10 billion yuan “1963-1965 was 7.4 billion yuan, the ”3 5“ period was 215 yuan, the ”4 5“ period was 47.3 billion yuan, ”5 “The period reached 87 billion yuan, and the ”sixth-five-year plan" was 130 billion yuan. The supply of funds is increasing step by step. However, due to the excessive concentration of various departments, changes in the distribution of funds have not brought into full play the role of economic benefits. According to the survey, the utilization rate of the fixed assets for the million-dollar digging, leather-cutting, and reform projects was only 62.4%, which was 16.7% lower than the delivery of the capital construction investment.