1工程概况安阳市环城河引水工程位于安阳市区,工程从万金渠南流寺引水,途经规划的西外环、文源南街和110kV电力高压走廊、安彩大道、铁西排洪沟,最后经中道口分水闸注入环城河,全长12.62km,总投资1538万元。上段9.4km采用DN800mm玻璃钢管,下段3.23km采用DN600mm玻璃钢管,管道间接口用套筒连接,设计水头22m,设计引水流量0.5m~3/s。环城河引水工程是安阳市第一次专门为环城河的环境用水而建设的工程,是市委常委会在第一批保持共产党员先进性
1 Project Overview Anyang City Huacheng River diversion project is located in Anyang City, the project from Wanjinqu Nanliu Temple diversion, via the planning of the West Outer Ring, Wenyuan South Street and 110kV power corridors, Ancai Avenue, Tiexi drainage ditch, Finally, through the middle of the mouth of the sluice into the ring River, a total length of 12.62km, a total investment of 15.38 million yuan. The upper section of 9.4km is made of DN800mm glass fiber reinforced plastic pipe, the lower section of 3.23km is made of DN600mm fiberglass pipe, the interface between pipes is connected with a sleeve, the head of water is designed to be 22m and the designed diversion flow is 0.5m ~ 3 / s. The Ring River Diversion Project is the first project in Anyang City specifically for the construction of environmental water around the city, the Municipal Standing Committee in the first batch to maintain the advanced nature of party members