论文部分内容阅读
本文介绍了川庆钻探工程有限公司长庆井下技术作业公司SS-2000型压裂车台上配置及各部分功率损失的情况;单台压裂车最佳输出的水马率和最高工作压力;针对目前苏里格气田施工的排量以及施工压力,机组最佳合理配置;以及对压裂车输出水马率及工作压力的应用方面提出了若干建议。
This article describes the Chuanqing Drilling Engineering Co., Ltd. Changqing underground technology operating company SS-2000 fracturing station configuration and power loss of various parts of the situation; the best output of a single hydraulic fracturing vehicle water horse and the maximum working pressure; In view of the current displacement and construction pressure of Sulige gas field construction, the optimal and reasonable configuration of generating units; and some suggestions on the application of the output water horse pressure and working pressure of the fracturing vehicles are put forward.