1.设备综合效率方面的问题作为TPM活动的重要管理项目,“设备综合效率”用来评价设备管理硬和软两个方面的指标.硬的方面,系统地找出阻碍设备综合效率的7大损失,分别用自主维修、计划维修和个别改善的活动进行改善,并将其效果与活动项目相结合,力图达到提高设备综合效率的目的.软的方面,用自主维修活动和计划维修体制等评价和强化企业素质,提高水平已取得共识.但是,设备综合效率不仅是为了设备管理.当做为追求有效的生产系统的重要因素时,根据笔者的体验,有如下的几个问题.①对应要求的生产量,由于操作人员对因生产节拍时间和机动循环时间之差所发生的生产线的综合效率掌握起来比较困难,亦即有必要明确操作等待状态和设备的短暂停机时间.②未使用提高计划停机和管理停机效率的指标,亦即必须把握对于操作时间的设备有效开动率指标.③对以手工作业为主体的装配线不能作出明确的评价,亦即有必要系统地建立人的作业效率和生产线效率的评价指标.④设备综合效率提高了,但向工厂的收益方面反映的少,亦即有必要明确与附加价值额和设备折旧费有关的各项经费等的关系,以及与制造成本间的关系.2.必须增加的补充指标
1. Problems in the overall efficiency of equipment As an important management project of TPM activities, “Comprehensive equipment efficiency” is used to evaluate the hard and soft indicators of equipment management. In terms of hard, systematically identify the 7 major obstacles to the overall efficiency of equipment. Losses are improved through independent maintenance, planned maintenance, and individual improvement activities, and their effects are combined with activity projects in an effort to achieve the goal of improving the overall efficiency of the equipment. The soft aspects are evaluated by independent maintenance activities and planned maintenance systems. A consensus has been reached to strengthen the quality of companies and raise their standards. However, the overall efficiency of equipment is not only for equipment management. When it is an important factor in the pursuit of an effective production system, according to the author’s experience, there are several issues as follows.1 Corresponding requirements The production volume, due to the operator’s grasp of the overall efficiency of the production line due to the difference between the tact time and the manoeuvring cycle time, is difficult to grasp, that is, it is necessary to clarify the operation waiting status and the equipment’s short-term downtime. 2 Not used to increase the planned downtime And the indicators for managing the shutdown efficiency, that is, it is necessary to grasp the effective activation rate index of the equipment for the operation time. .3 No clear evaluation can be made on assembly lines with manual operations as the main body, that is, it is necessary to systematically establish the evaluation indexes of human working efficiency and production line efficiency. 4 The overall equipment efficiency is improved, but the return to the factory is less. , that is, it is necessary to clarify the relationship between the various expenses related to the value added and equipment depreciation, etc., and the relationship with the manufacturing cost. 2. Additional indicators that must be added