论文部分内容阅读
南水北调——记者从黄河水利委员会了 解到南水北调西线工程规划从长江上游的 通天河、雅砻河、大渡河、金沙江引水到黄 河上游。一期工程将于2010年左右开工建 设,规划从雅砻江和大渡河间的5条支流引水到黄河上游的贾曲 年引水量40亿立方 米,通过开凿长隧洞穿越巴颜喀拉山长江黄 河分水岭,自流到黄河。
South-to-North Water Transfer Project—Reporters from the Yellow River Conservancy Commission to the West Route of the South-to-North Water Diversion Project plan to draw water from the Tongtian River, Yalong River, Dadu River, and Jinsha River upstream of the Yangtze River to the upper Yellow River. The first phase of the project will start construction around 2010, planning to divert water from the five tributaries between the Yalong River and the Dadu River to the water diversion volume of Jiaqu in the upper reaches of the Yellow River by 4 billion cubic meters, and to drill long tunnels to cross the Yangtze River in Bayan Harla. The Yellow River divides the water and flows to the Yellow River.