论文部分内容阅读
针对新集一矿主井特点 ,设计了托罐装置井进行了托力的计算和主要部件强度校核
Aiming at the characteristics of the main shaft of Xinji No.1 Mine, the design of the bracket-supporting well and the verification of the strength of the main components