论文部分内容阅读
枫树坝电厂位于河源龙川县境内,是以发电为主,兼具防洪和航运灌溉补水的综合利用工程。文章介绍了枫树坝电厂主变洞原220kV GIS组合电器运行中存在的问题、改造的背景以及现220kV配电装置的改造设计和工程的相关问题。
Maple dam power plant located in Longyuan County, Heyuan, is based on power generation, both flood control and shipping irrigation water comprehensive utilization project. This paper introduces the problems existing in the operation of Fengzhaodongyuan 220kV GIS combinational electrical appliance in Mapashiba Power Plant, the background of the retrofit and the related problems of the retrofit design and engineering of the existing 220kV power distribution unit.