随着铁路运行速度的逐步提高,铁道部和路局整体规划,以机械化施工单位为主体在既有线上实施“三同步”形式的大中修来改善线路设备质量已逐步开展。如何在既有线大中修期间做好施工配合工作,确保施工安全并保证质量,已经成为工务段面临的一项新的课题。本文从京九线“三同步”综合大修施工中工务段所作的配合工作浅析配合方案的现场实施。
With the gradual increase in the speed of railway operation, the overall planning of the Ministry of Railways and the Administration of Railways has been gradually carried out to improve the quality of the railway equipment with the major and medium-sized repairs in the form of “Three Synchronizations ” by the mechanized construction units. How to do the construction and coordination work during the large and medium-sized existing repairs of the existing lines to ensure the construction safety and ensure the quality has become a new subject that the public works section faces. This article from the Beijing-Kowloon line “three synchronization ” comprehensive overhaul works in the work section with the work of the site with the implementation of the program.