Importance of building maintenance at the time of architectural design of buildings rehabilitated wi

来源 :西安建筑科技大学学报(自然科学版) | 被引量 : 0次 | 上传用户:zx12122111121W
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
During architectural conception phase,building maintenance problematic is mostly a result of the unintentional use of preconceived architectonical solutions rather than a consequence of a specific influence of maintenance requirements.Hardly the architect in the act of design understands the importance of these solutions in the service life span of a building.Being aware of this,is it possible for the architect to be supplied with a decision support system that allows him to consider the implications of building maintenance since the early design phases? Having awareness of this problem and its consequences in the early design phases a research project was started at the Faculty Engineering of the University of Oporto(FEUP),under which the implications of building maintenance in the act of architectural design is studied.This article presents the methodology developed to identify the needs of maintenance of buildings based on a DSS-decision support system that provides simple tools the architect can use in design phase.This methodology is based on decomposition of building parts-Elements Source of Maintenance ESM-,and subsequently,a set of functional requirements that determine the performance regarding building maintenance on account of architectural decisions.Relevant maintenance actions are defined: Inspection,Pro-action,Cleaning,Correction,Replacement,Legal enforcement,Limits of use.One can thus set up a relationship between the act of design and its performance framework based on behavior,intervention and the ownership of the work of architecture.Using a Multicriteria Analysis(MCA) a qualitative evaluation of different options based on maintenance requirements accomplishment.Conclusions on the importance of architectural conception concerning the building maintenance were clearly arrived at and the utility of the developed decision support tool was also highlighted. During architectural conception phase, building maintenance problematic is mostly a result of the unintentional use of preconceived architectonical solutions rather than a consequence of a specific influence of maintenance requirements. Hardly the architect in the act of design understands the importance of these solutions in the service life span of a building.Being aware of this, is it possible for the architect to be supplied with a decision support system that allows him to consider the implications of building maintenance since the early design phases? Having awareness of this problem and its consequences in the early design phases a research project was started at the Faculty Engineering of the University of Oporto (FEUP), under which the implications of building maintenance in the act of architectural design is studied. This article presents the methodology developed to identify the needs of maintenance of buildings based on a DSS-decision support system that provides simple tools the architect can use in design phase. This methodology is based on decomposition of building parts-Elements Source of Maintenance ESM-, and subsequently, a set of functional requirements that determines the performance concerning building maintenance on account of architectural decisions. : Inspection, Pro-action, Cleaning, Correction, Replacement, Legal enforcement, Limits of use. One can set up a relationship between the act of design and its performance framework based on behavior, intervention and the ownership of the work of architecture. Using a Multicriteria Analysis (MCA) a qualitative evaluation of different options based on maintenance requirements accomplishment. Confclusions on the importance of architectural conception concerning the building maintenance were clearly arrived at and the utility of the developed decision support tool was also highlighted.
其他文献
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
近日,福田雷沃重工在潍坊培训基地举办了装载机海外经销商服务培训班,来自巴西、南非、缅甸等7个国家的20余名经销商服务人员参加了此次培训,并纷纷表示这次培训获益匪浅。此
“黄金十年的梦幻景色已经只属于会议宣传,但在这里,仍能听到一句‘我有信心’。”这是来自bauma China 2012主办方的声音。虽然工程机械行业在全球经济危机的影响下,2012年
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
1BC India 2013近几年印度每年工程机械设备销售额在15亿~20亿美元,年增长率20%~30%。目前印度商品混凝土使用率不足1%,未来5年使用量将以30%的速度增长。作为世界上发展最快的
在中国工程机械工业协会第四届二次会员代表大会暨第十届工程机械发展高层论坛会议上,中国工程机械工业协会会长祁俊所做的行业报告中,对行业2012年的走势做了充分分析。这其
bauma China 2012已经谢幕,但对于众多企业来讲,总结参展效果的工作才刚刚开始。只有不断寻求自身的不足,以及总结榜样的力量,才能让自己今后在展会上的投入更加物有所值——
9月份商品和服务赤字缩小至415亿美元,从而提高了人们对于美国经济增强的希望。此数字比8月份的赤字(即438亿美元)低5.1%,为自2010年12月以来的最低赤字。受飞机和重型机械销
本届bauma China展会,三一重工携51台展品强势登场,展品数量又一次创下历史之最。三一集团总裁唐修国表示,“这是一次对所有用户的展示和汇报。” The current bauma China