砚目狱t推落施工工艺不冲洗高压水泥湘浆帷幕城路总长(米)1175帷落扭盆总面积(万米2)18.5帷幕祖狱钻孔总长(万米)比.97.大祖浆压力(公斤/厘米2)6。.幕祖桨注入水泥总t(吨)5560。平均每米钻孔注入水泥t(公斤/米)293沿.书峨沙一总t(米3/县夜)约68.书位查孔总长(万米)。.7.猫位查
Yan Tang Yu pushed down the construction process does not flush the high-pressure cement Xiang slurry curtain City Road Length (m) 1175 The total area of the wall hanging Curse (million meters 2) 18.5 Curtain ZuGe total length of drilling (million meters) than .97. Pulp pressure (kg / cm 2) 6. The total amount of cement injected into the celestial paddy is t (ton) 5560. The average per meter borehole injection of cement t (kg / m) 293 along. Book of sand total t (m 3 / county night) about 68. .7. Cat investigation