缅甸钦敦江大桥为公铁两用的栓焊下承式钢桁梁桥 ,主跨 112 m。中国路桥公司负责该桥主桥上部结构设计、施工设计、上部结构施工指导和监理 ;缅方负责下部构造设计和上、下部结构施工。施工中当钢梁悬臂拼装 80 m时 ,利用吊索架挂索张拉 ,对钢梁施以一定的预拉索力 ,以减少钢梁控制部位杆件内力并利用了温差法成功地实现了钢梁纵移 ,全桥于 1999年 9月建成通车
Chinchon Bridge in Myanmar is a type of bolted welded steel truss girder bridge with a total length of 112 m. China Road & Bridge Company is responsible for the superstructure design, construction design and superstructure construction guidance and supervision of the main bridge of the bridge; Myanmar is responsible for the structural design of the lower part and the construction of the upper and lower structures. During the construction, when the steel beam cantilever is assembled to 80 m, the tension of the slings is used to prestress the steel girders to reduce the internal force of the bars of the steel girder control parts and the temperature difference method is successfully used Longitudinal steel beam, full bridge was opened to traffic in September 1999