论文部分内容阅读
本文应用系统分析方法对二滩水电站双曲拱坝混凝土浇注方案进行计算机模拟,计算成果符合一般施工规律,初步证明该程序在总体上是成功的。
In this paper, the system simulation method was used to simulate the concrete pouring scheme of the double-curvature arch dam of Ertan Hydropower Station. The calculation results accorded with the general construction rules, and the procedure was initially proved to be successful.