现浇混凝土结构底模拆模时间的控制,在工程施工中非常重要。目前在工程质量检查中,发现部分工程现浇结构在模板拆除施工时,并未按照规范要求执行,导致现浇楼板出现不同程度的开裂现象、承载力降低等质量问题。因此,加强现浇混凝土结构底模拆除施工的监管非常重要。一、工程准备工程开工前,施工单位由试验员根据设计和规范要求、施工组织设计等编制混凝土
Cast-in-place concrete floor demolding time control, in construction is very important. Currently in the project quality inspection, found that some of the project cast-in-place structure in the template demolition construction, not in accordance with the requirements of the implementation of the specification, resulting in the emergence of cast-in-place floor to varying degrees cracking phenomenon, bearing capacity and other quality problems. Therefore, to strengthen the demolition of cast-in-place concrete floor demolition supervision is very important. First, the project preparation Before the commencement of construction, the construction unit by the testers according to the design and specification requirements, construction design and other preparation of concrete