论文部分内容阅读
山东铝业公司工程公司在氧化铝厂第二赤泥堆场ZYP新型橡胶防水卷材施工中,采用“格式空铺法”,不仅节约材料费38.88万元,而且提高工效1~2倍,使一期工程提前投运。第二赤泥堆场工程地面14万m2,需浇筑100mm厚混凝土垫层,用水泥砂浆抹面,然后铺防水卷材1层,再抹1层水泥砂浆...
Shandong Aluminum Corporation Engineering Company used the “format empty shop method” in the construction of ZYP new rubber waterproofing membrane in the second red mud yard of alumina plant, which not only saved material expenses of 388,800 yuan, but also improved work efficiency by 1 to 2 times. The first phase of the project will be put into operation in advance. The second red mud yard project ground 140,000 m2, need to cast 100mm thick concrete cushion, use cement mortar to wipe the surface, and then spread the waterproof membrane 1 layer, then wipe 1 layer of cement mortar...