我处承建的遂昌县成屏一级电站大坝是新型的混凝土面板堆石坝,面板混凝土厚度由0.50m(联接头墙趾板处)渐变为0.30m(坝顶处)。面板混凝土坡比为1∶1.3,分二期浇筑,第一期浇至320m高程。为了提高面板混凝土质量,加快施工速度,减低劳动强度,混凝土浇捣采用滑模施工。滑模全套图纸由我局技术设计室设计,轨道及支座部份由我处设计。滑模的全部构件及金加
The Suichang County Chengping-I Hydropower Station Dam, a new type of concrete faced rockfill dam, was constructed by our office. The thickness of the concrete slab was gradually changed from 0.50m (at the toe of the joint head wall) to 0.30m (at the crest of the crest). Panel concrete slope ratio of 1: 1.3, divided into two phases pouring, the first phase of pouring to 320m elevation. In order to improve the quality of concrete panels, speed up the construction speed, reduce labor intensity, concrete pouring using sliding mode construction. Sliding mode full set of drawings by the Bureau of technical design room design, track and bearing part by my office design. Slide all the components and gold plus